Construction Work at Van Dulmplein
On Monday, January 23, from 7:00 a.m. to 5:00 p.m., Van Dulmplein will be closed at number 1.
On that day, Open Dutch Fiber will install a fiber-optic neighborhood distribution frame. This is a technical enclosure measuring approximately 2.5 metre by 6 metre. From this enclosure, 3,300 to 6,600 addresses will be connected to the fiber-optic network.